parcelsfolder.portlandmaine.gov - /Files/012/012 Q012/Building Permit/2018-00134 New Commercial Structure/1. Original Plans/
[To Parent Directory]
A0-1 EXTERIOR WALL, FLOOR, CEILING AND ROOF TYPES
A0-2 INTERIOR WALL TYPES
A1-1 FIRST FLOOR PLAN
A1-10 UNIT 201
A1-11 UNIT 202
A1-12 UNIT 203
A1-13 UNIT 204
A1-14 UNIT 205
A1-15 UNIT 301
A1-16 UNIT 302
A1-17 UNIT 303
A1-18 UNIT 304
A1-19 UNIT 305
A1-2 SECOND FLOOR PLAN
A1-20 UNIT 306
A1-21 UNIT 307
A1-22 UNIT 308
A1-23 UNIT 401
A1-24 UNIT 402
A1-25 UNIT 403
A1-26 UNIT 404
A1-27 UNIT 405
A1-28 UNIT 406
A1-29 LOBBY PLAN
A1-3 THIRD FLOOR PLAN
A1-30 UNIT 201-203 REFLECTED CEILING PLANS
A1-31 UNIT 204-205 REFLECTED CEILING PLANS
A1-32 UNIT 301-304, 306 REFLECTED CEILING PLAN
A1-33 UNIT 305, 307-308 REFLECTED CEILING PLANS
A1-34 UNIT 401-406 REFLECTED CEILING PLAN
A1-35 FITNESS AND STORAGE ENGLARGED PLAN
A1-4 FOURTH FLOOR PLAN
A1-5A ROOF PLAN (GARDEN, STONE AND ROOF DECK)
A1-5B ROOF PLAN (PITCH AND DRAIN)
A1-6 FIRST FLOOR COMMON AREAS RCP
A1-7 SECOND FLOOR COMMON AREAS RCP
A1-8 THIRD FLOOR COMMON AREAS RCP
A1-9 FOURTH FLOOR COMMON AREAS RCP
A2-0 EAST AND WEST ELEVATIONS
A2-1 NORTH AND SOUTH ELEVATIONS
A2-2 ENLARGED ELEVATIONS
A3-0 SECTIONS
A3-1 SECTIONS
A3-2 SECTIONS
A3-3 SECTIONS
A3-4 SECTIONS
A4-0 INTERIOR ELEVATIONS - PUBLIC AREAS
A4-1 INTERIOR ELEVATIONS - PUBLIC AREAS
A4-10 UNIT 201 INTERIOR ELEVATIONS
A4-11 UNIT 202 INTERIOR ELEVATIONS
A4-12 UNIT 203 INTERIOR ELEVATIONS
A4-13 UNIT 204 INTERIOR ELEVATIONS
A4-14 UNIT 205 INTERIOR ELEVATIONS
A4-15 UNIT 301 INTERIOR ELEVATIONS
A4-16 UNIT 302 INTERIOR ELEVATIONS
A4-17 UNIT 303 INTERIOR ELEVATIONS
A4-18 UNIT 304 INTERIOR ELEVATIONS
A4-19 UNIT 305 INTERIOR ELEVATIONS
A4-2 INTERIOR ELEVATIONS - SECOND FLOOR CORRIDORS
A4-20 UNIT 306 INTERIOR ELEVATIONS
A4-21 UNIT 307 INTERIOR ELEVATIONS
A4-22 UNIT 308 INTERIOR ELEVATIONS
A4-23 UNIT 401 INTERIOR ELEVATIONS
A4-24 UNIT 402 INTERIOR ELEVATIONS
A4-25 UNIT 403 INTERIOR ELEVATIONS
A4-26 UNIT 404 INTERIOR ELEVATIONS
A4-27 UNIT 405 INTERIOR ELEVATIONS
A4-28 UNIT 406 INTERIOR ELEVATIONS
A4-3 INTERIOR ELEVATIONS - THIRD FLOOR CORRIDORS
A4-4 INTERIOR ELEVATIONS - FOURTH FOOR CORRIDORS
A5-0 DETAILS
A5-1 DETAILS
A5-10 DETAILS
A5-11 DETAILS
A5-12 DETAILS
A5-13 DETAILS
A5-2 DETAILS
A5-20 DETAILS
A5-22 DETAILS
A5-23 DETAILS
A5-24 DETAILS
A5-25 DETAILS
A5-26 DETAILS
A5-27 DETAILS
A5-28 DETAILS
A5-3 DETAILS
A5-30 FIRE PLACE DETAILS
A5-31 FIRE PLACE DETAILS
A5-32 FIRE PLACE DETAILS
A5-4 DETAILS
A6-0 STAIR 001
A6-1 ELEVATOR AND STAIR 002
A6-2 ELEVATOR DETAILS
A6-3 PLAN AND SECTION AT SIDE ENTRY 105
A7-0 DOOR SCHEDULE
A7-1 DOOR SCHEDULE CONTINUED
A7-2 WINDOW SCHEDULE
A7-3 FINISH SCHEDULE
Existing Site Plan - C-03 Demo, Construction Management, & Erosion Control Plan
G1-1 FIRST FLOOR LIFE SAFETY PLAN
G1-2 SECOND FLOOR LIFE SAFETY PLAN
G1-3 THIRD FLOOR LIFE SAFETY PLAN
G1-4 FOURTH FLOOR LIFE SAFETY PLAN
Proposed Building Site Plan
S1.1 Foundation Plan
S1.2 Second Floor Framing Plan
S1.3 Third Floor Framing Plan
S1.4 Fourth Floor Low Roof Framig Plan
S1.5 Roof Framing Plan
S2.1 Details
S2.2 Details
S3.1 Details
S3.2 Details
S3.3 Details
S4.1 Details