parcelsfolder.portlandmaine.gov - /Files/411/411 A007/Building Permits/2016-02681 Building Amendment to Commercial/1. Original Plans/


[To Parent Directory]

A0.0 - Cover Sheet
A0.1 - First Floor Egress Plan
A0.3 - Third Floor Egress Plan
A0.4 - Fourth Floor Egress Plan
A0.5 - Site Exiting Plan - Code Summary
A1.1 - Site Plan
A1.3a - Planting Plan
A1.9 - Site Details
A2.1 - First Floor Reference Plan
A2.2 - Second Floor Reference Plan
A2.3 - Third Floor Reference Plan
A2.4 - Fourth Floor Reference Plan
A2.5 - Roof Plan
A2.6 - Attic Plan
A3.1 - 1st Floor Core Plan
A3.10 - 4th Floor Core Plan
A3.11 - 4th Floor Wing B Plan
A3.12 - 4th Floor Wing C Plan
A3.2 - 1st Floor Wing B Plan
A3.3 - 1st Floor Wing C Plan
A3.4 - 2nd Floor Core Plan
A3.5 - 2nd Floor Wing B Plan
A3.6 - 2nd Floor Wing C Plan
A3.7 - 3rd Floor Core Plan
A3.8 - 3rd Floor Wing B Plan
A3.9 - 3rd Floor Wing C Plan
A4.0 - Entry Canopy Details
A4.1 - First Floor Core Ceiling Plan
A4.2 - Second Floor Core Ceiling Plan
A4.3 - Third Floor Core Ceiling Plan
A4.4 - Fourth Floor Core Ceiling Plan
A4.5 - Wing B Ceiling Plan
A4.6 - Wing C Ceiling Plan
A4.7 - Enlarged Ceiling Plans
A5.1 - Suite Plans
A5.4 - Suite Plans
A5.5 - Suite Plans
A5.7 - Suite Plans
A5.8 - Suite Plans
A5.9 - Suite Plans
A6.0b - Core Building Sections
A6.0c - Core Building Sections
A6.2c - Core Building Sections
A6.3a - Exterior Building Elevations
A6.3b - Exterior Building Elevations
A6.3d - Exterior Building Elevations
A6.4 - Cement Siding Ext Building Details
A6.5 - Cement Siding Ext. Building Details
A7.1a - Floor and Wall Types
A7.1b - Floor and Wall Types
A7.2a - Roof Details
A7.2c - Roof Details
A7.4 - Stair Details
A7.5 - Kitchen Hood Details
A8.0a - Window Schedule and Details
A8.0b - Finish Schedule
A8.1 - Interior Details
A8.2a - Door Schedule
A8.2b - Door Details
A8.3a - Restroom and Accessible Details
A8.3b - Restroom and Accessible Details
A8.4a - Interior Elevations and Details
A8.4b - Interior Elevations and Details
A8.4c - Interior Elevations and Details
A8.4d - Interior Elevatoins and Details
A8.4e - Interior Elevations and Details
A8.4f - Interior Elevations and Details
A8.5 - Interior Elevations and Details
A8.6 - MIsc. Elevations and Details
A8.7 - Firewall and Interior Rated Details
A8.8 - Fire Rated Construction Details
A9.1 - BCSI-B3 Summary Sheet (ref only)
E1.0a - Electrical Site Plan
E1.0b - Site LIghting Photometric Plan Parking - PL
E1.0c - Site LIghting Photometric Plan Overall Site
E1.1L - First Floor Lighting Core Plan
E1.1P - First Floor Power Core Plan
E1.5L - Wing B Light Ref. Clg. Plan
E1.5P - Wing B Power Plan
E1.6L - Wing C Lighting Ref. Clg. Plan
E1.6P - Wing C Power Plan
E1.7P - Attic Power Plan
E2.2b - Electrical Details
E3.1 - 1st Floor Core Schematic Low Voltage
E3.5 - Wing B Schematic Low Voltage
E3.6 - Wing C Schematic Low Voltage
E4.2 - Low Voltage Diagrams - Details
E5.0 - Electrical Kitchen Plan
E5.1 - Electrical Suite Plans
E5.5 - Electrical Accessible Suite Plans
E5.9 - Electrical Accessible Suite Plans
M1.1 - First Floor Waste Piping
M1.5 - First Floor Hot and Cold Piping Plan
M1.6 - Second Floor Hot and Cold Piping Plan
M1.8 - Fourth Floor Hot and Cold Piping Plan
M2.4 - Plumbing Details and Schedules
M2.6 - First Floor Core Plan Radon
M3.1 - First Floor Core HVAC Plan
M3.2 - Second Floor Core HAC Plan
M3.6 - Wing B HVAC Plan
M3.7 - Wing C HVAC Plan
M4.0 - HVAC Details
M4.1 - HVAC Details
M5.3 - Sprinkler Code and Specifications
S0.1 - 1st Floor Hold Down Plan
S0.2 - 1st Floor Shearwall Plan
S1.1 - Core Foundation Plan
S1.10 - 4th Floor Core Framing Plan
S1.11 - 4th Floor Wing B Framing Plan
S1.12 - 4th Floor Wing C Framing Plan
S1.14 - Wing B Roof Framing Plan
S1.15 - Wing C Roof Framing Plan
S1.2 - Wing B Foundation Plan
S1.3 - Wing C Foundation Plan
S1.4 - 2nd Floor Core Framing Plan
S1.5 - 2nd Floor Wing B Framing Plan
S1.6 - 2nd Floor Wing C Framing Plan
S1.7 - 3rd Floor Core Framing Plan
S1.8 - 3rd Floor Wing B Framing Plan
S1.9 - 3rd Floor Wing C Framing Plan
S2.1 - Structural Specifications
S2.2 - Foundation Details
S2.3 - Structural Framing Details
S2.8 - Structural 2 Hour Details
S3.5 - Structural Details
SC1.1 - 1st Floor Schematic Smoke Control
SC2.1 - Smoke Control Details and Schedules