parcelsfolder.portlandmaine.gov - /Files/166/166 A010/Building Permits/2012-65524/Drawings/
[To Parent Directory]
149100 - Facility Chutes
1969 Site Plan - Info Only
210800876_SEASIDE_cover_BID_C-0_102912
A0.1 Code Plans First Floor
A0.1 First Floor Plan smoke barrier
A0.1 First Floor Plan-SB revised
A0.2 Code Plans Second Floor
A0.2 Second Floor Plan smoke barrier
A0.2 Second Floor Plan-SB revised
A1.1 First Floor Plan (Revised)
A1.1 First Floor Plan
A1.2 Second Floor Plan (Revised)
A1.2 Second Floor Plan
A1.3 Roof Plan
A1.4 Roof Details
A1.4 SHED PLANS
A2.1 Ext Elevations
A2.2 Ext Elevations
A3.1 Building Sections
A3.10 Wall Sections
A3.11 Wall Sections
A3.2 Building Sections
A3.3 Wall Sections
A3.4 Wall Sections
A3.5 Wall Sections
A3.6 Wall Sections
A3.7 Wall Sections
A3.8 Wall Sections
A3.9 Wall Sections
A4.1 Stair-Elev Sections
A4.2 SectionDetails
A4.3 SectionDetails
A4.4 SectionDetails
A4.5 SectionDetails
A4.6 PlanDetails
A5.1 First Floor RCP
A5.2 Second Floor RCP
A6.1 First Floor Int Plan
A6.2 Second Floor Int Plan
A6.3 Interior Elevations
A6.4 Interior Elevations
A6.5 Casework
A6.6 Details
A7.1 Door Window Schedules
A7.2 Finish Schedule
A7.3 Interior Door Details
A7.4 Exterior Door & Window Details
A7.5 Exterior Door & Window Details
agg pier plan_SWCE Comments_2013-01-02
Bennett Electrical Com Check - Seaside
Bennett Mechanical Com Check - Seaside
C-1 Existing Conditions Plan 102912
C-2 Utilities Layout Plan 102912
C-3 Driveway Courtyard Layout Plan 102912
C-4 Grading and Drainage Plan 102912
C-5 Planting Plan 102912
C-6 Site Details 102912
C-7 Site Details 102912
C-8 Site Details 102912
C-9 Site Details 102912
D1.1 Demo Plans
E1 Site Electrical Plan
E2 First Floor Lighting Plan
E2.1 Second Floor Lighting Plan
E3 First Floor Power Plan
E3.1 Second Floor Power Plan
E3.2 Roof Power Plan
E4 Notes Legends and Lighting Sched
E4.1 Panel Sched. OneLine and Details
E4.2 Panel Sched. OneLine and Details
E4.3 Panel Schedules
Foreside Architectural Com Check - Seaside
G1 Titlesheet
G2 Abbrev-Wall Types revised
G2 Abbrev-Wall Types-Symbols
G3 ACCESSIBILITY STANDARDS
M1.1 Mech. First Floor Plan
M1.2 Mech. Second Floor Plan
M1.3 First Floor Refrig. Plan
M1.4 Second Floor Refrig. Plan
M1.5 VRV Syst. Equip. Sched
M1.6 VRV Syst. Equip. Sched
M1.7 VRV First Floor Wiring Schem
M2.1 Mech. Schedules
M2.2 Mechanical Schedules and Details
M2.3 Mechanical Details and Legend
P1.1 First Floor Plumbing Plan
P1.2 Second Floor Plumbing Plan
P1.3 Existing Building Plumbing Plan
Project Boundary Survey
S1.0 General Notes 102912
S1.1 Foundation Plan 102912
S1.2 Second Floor Framing Plan 102912
S1.3 Roof Framing Plan 102912
S1.4 Roof Truss Plans 102912
S1.5 Bracing Elevs and Details
S2.1 Concrete Sections and Details
S3.1 Framing Sections and Details
S3.2 Structural Sections and Details
S3.3 Framing Sections Struct Details
Seaside Code Review - Sliding Door Response 012113
State Fire Marshal - Request for Additional Information