001 CS Cover Sheet
002 LSP Life Safety Plan
010 C-1 Civil Details, Notes, Specs
011 C-3.0 Site Layout and Utility Plan
020 SPI Special Inspections
021 F-01 Foundation Plan
022 F-02 Foundation Details
023 F-03 Foundation Details
024 F-04 Sawcut Plan
030 BMC Cover Sheet
031 BMC Codes and Loads
032 BMC Erection Notes
033 BMC Anchor Rod Plan
034 BMC Anchor Rod Plan - Details
035 BMC Primary and Roof Bracing Plan
036 BMC Frame X-Sect Line 1
037 BMC Frame X-Sect Line 2
038 BMC Portal Frame Line E
039 BMC Primary Bracing Details
040 BMC Roof Secondary Plan
041 BMC Roof Secondary Details
042 BMC Roof Secondary Details
043 BMC Secondary Elev Line 1
044 BMC Secondary Elev Line A
045 BMC Seondary Elev Line 2
046 BMC Seondary Elev Line E
047 BMC Wall Secondary Details
048 BMC Wall Secondary Details
049 BMC Roof Plan
050 BMC Wall Covering Line 1
051 BMC Wall Covering Line A
052 BMC Wall Covering Line 2
053 BMC Wall Covering Line E
054 BMC Wall Covering Details
055 BMC Wall Covering Details
06-06-2016 Letter from Peter Holmes
060 A-1.1 Floor Plan & Details
061 A-1.2 Enlarged Partial Floor Plan
062 A-2 Schedules, Finish Notes
063 A-3.1 Reflected Ceiling Plans
064 A-3.2 Reflected Ceiling Plan
065 A-4 Sections & Details
066 A-5 Exterior Elevations
067 A-6 Millwork Elevations & Details
068 A-7 2010 ADA Standards
069 CFM-1 Typical Stud Details
070 CFM-2 Typical Stud Details
071 CFM-3 Typical Stud Details
072 FRA-3 Fire Separation Wall Details
073 MS-1 Miscellaneous Items
080 P-1 Plumbing Plan
090 M-0 Cover Sheet
091 M-1 Duct Plan
092 M-2 Gas Piping Plan
093 M-3 Equip Schedules and Details
094 M-4 Mechanical Specs
100 E-1.0 Lighting-Power Full Floor Plan
101 E-1.1 Enlarged Lighting Plan
102 E-2.0 Enlarged Power Plan
103 E-3.0 Fire Alarm Layout and Details
104 E-3.1 Fire Alarm Layout and Riser Diagram
105 E-4.0 Legend, Notes, and Abbreviations
106 E-4.1 Panel Schedules and One Line Diagram
200 Warehouse Racking (10 pgs)
200 Warehouse Racking (9 pgs) 2016 05-14
23000 M0 Cover Sheet 2016 04-25
23000 M1 Duct Plan 2016 04-25
23000 M2 Gas Piping Plan 2016 04-25
23000 M3 Equip Schedules and Details 2016 04-25
23000 M4 Mechanical Specs 2016 04-25
23000 P-1 Plumbing Plan 2016 04-25
26000 E-1.0 Lighting-Power Full Floor Plan 2016 05-04
26000 E-1.1 Enlarged Lighting Plan 2016 05-04
26000 E-2.0 Enlarged Power Plan 2016 05-04
26000 E-3.0 Fire Alarm Layout and Details 2016 05-04
26000 E-3.1 Fire Alarm Layout and Riser Diagram 2016 05-04
26000 E-4.0 Legend, Notes, and Abbreviations 2016 05-04
26000 E-4.1 Panel Schedules and One Line Diagram 2016 05-04
A1.1 Floor Plan
A2 Schedules, finish notes & hardware
A3.1 Reflected Ceiling Plan
A3.2 Reflected Ceiling Plan
A4r3 Details
A5r3 Exterior Elevations
A6 Millwork Elevations & Details
A7 A.D.A. 2010 Standards
C-1 Site details & specs.
COVER SHEET r3
F-01r1 Foundation Plan
F-02r1 Foundation sections & details
F-03r1 Foundation sections & details
F-04 Slab Saw Cut Plan
Letter of Transmittal
PORTLAND-A7 ADA (1)
RTU 48TC-04-16-03PD
SFM Permit
Site Plan C-3.0
Tyco Model WS Window Sprinklers TFP620_05_2014