parcelsfolder.portlandmaine.gov - /Files/041/041 A017/PDF 101205/FULL Permit Documents/CCS FINAL PERMIT DWGS PART 1 9.24.10/


[To Parent Directory]

0. A0.1 Cover Sheet
1. EC-1.1 Existing Conditions Survey
10. C-3.0 Erosion and Sedimentation Control Notes and Details
11. C-3.1 Site Details
12. A1.0 Basement Plan
13. A1.1 1st Floor Plan
14. A1.2 2nd Floor Plan
15. A1.3 3rd Floor Plan
16. A1.4 4th Floor Plan
17. A1.5 5th Floor Plan
18. A1.6 Roof Plan
19. A2.1 Building Elevations
2. L-1.1 Site Preparation Plan
20. A2.2 Building Elevations
21. A3.1 Building Sections
22. A3.2 Building Sections
23. A4.2 Main Lobby Plans_Sections_Int. Elevations#6D1A
24. A4.4 Window Schedule_Types#95DD
25. A4.5 Window Details
26. A4.6 Door Sch & Dtls
27. A4.7 Door Details
28. A5.1 Stair 1 Plans _ Sections#C469
29. A5.2 Stair 2 Plans _ Sections#0C06
3. L-2.1 Site Layout Plan
30. A5.3 Stair Details
31. A5.4 Elevator Plans_Section_Details#3D7C
32. A6.1 Partitions & Finish Schedule
33. S1.0 General Notes
34. S1.1 Basement_Foundation Plan#2078
35. S1.2 1st Floor Framing Plan
36. S1.3 2nd Floor Framing Plan
37. S1.4 3rd Floor Framing Plan
38. S1.5 4th Floor Framing Plan
39. S1.6 5th Floor Framing Plan
4. L-3.1 Site Grading Plan
40. S1.7 Roof Framing Plan
41. S2.1 Sections_Details#1928
42. S2.2 Sections_Details#C9E9
43. S3.1 Sections_Details#9EA0
44. S3.2 Sections_Details#DAB5
45. S4.0 Facade Restoration
46. M1 1st Floor Mechanical Ductwork
47. M2 2nd Floor Mechanical Ductwork
48. M3 3rd Floor Mechanical Ductwork
49. M4 4th Floor Mechanical Ductwork
5. L-4.1 Landscape Plan
50. M5 5th Floor Mechanical Ductwork
51. M6 Basement Mechanical Piping Plan
52. M7 1st Floor Mechanical Piping Plan
53. M8 2nd Floor Mechanical Piping Plan
54. M9 3rd Floor Mechanical Piping Plan
55. M10 4th Floor Mechanical Piping Plan
56. M11 5th Floor Mechanical Piping Plan
57. M12 Roof Mechanical Piping Plan
58. M13 Boiler Room Plan and Details
59. M14 Heat Pump System Diagrams
6. L-5.1 Site Details
60. M15 General Mechanical Details
61. M16 Mechanical Equipment Schedules
7. L-5.2 Site Details
8. C-1.1 Erosion and Sedimentation Control Plan
9. C-2.1 Utility Plan