parcelsfolder.portlandmaine.gov - /Files/061/061 f003/PDF071184/
[To Parent Directory]
11.29.07 response to Mike Nugent
A-0.0 COVER SHEET
A-1.1 GROUND FLOOR PLAN
A-1.2 FIRST FLOOR PLAN
A-1.3 UPPER FLOOR PLAN
A-1.4 ROOF PLAN
A-2.1 ELEVATIONS
A-3.1 BLDG SECTIONS
A-3.2 BLDG SECTIONS
A-3.3 BLDG SECTIONS
A-3.4 BLDG SECTIONS
A-4.1 WALL SECTIONS
A-4.2 WALL SECTIONS
A-4.3 WALL SECTIONS
A-5.1-PLAN DETAILS
A-5.2-SECT DETAILS
A-5.3-STAIRWELLS
A-6.1 INT ELEVATIONS
A-6.2 INT ELEVATIONS
A-6.3 BATHROOMS
A-7.1 GROUND FLOOR RCP
A-7.2 FIRST FLOOR RCP
A-7.3 UPPER FLOOR RCP
A-8.1-SCHEDULES
A-8.2-WINDOW SCHEDULES
C1.0 9-7-07
C1.1 9-7-07
D-1.1 GROUND FLOOR DEMOLITION PLAN
D-1.2 FIRST FLOOR DEMOLITION PLAN
D-1.3 UPPER FLOOR DEMOLITION PLAN
D1.0 9-7-07
E-1.0 ELECTRICAL NOTES
E-1.1. ELECTRICAL DEMOLITION FLOOR PLAN
E-1.10 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-1.11 ELECTRICAL PANEL SCHEDULES
E-1.2 POWER AND SYSTEMS GROUND FLOOR PLAN
E-1.3 LIGHTING GROUND FLOOR PLAN
E-1.4 POWER AND SYSTEMS FIRST FLOOR PLAN
E-1.5 LIGHTING FIRST FLOOR PLAN
E-1.6 POWER AND SYSTEMS UPPER FLOOR PLAN
E-1.7 LIGHTING UPPER FLOOR PLAN
E-1.8 STAGE LIGHTING AND SOUND SYSTEM DIAGRAM
E-1.9 ELECTRICAL DETAILS AND RISER DIAGRAMS
E-2.0 SITE LIGHTING
FINAL WAYNFLETE BID SPECS
L-1.1
L-1.1B
l-1.2
L-1.3
L-1.4
L-1.5
M1
M2
M3
M4
M5
M6
M7
M8
S1.0
S1.1
S1.1A
S1.2
S1.3
S1.3A
S1.4
S1.5
S1.6
S2.1
S2.2
S2.3
S3.1
S3.2
S3.3
S3.4
S3.5
S3.6
SI Statement
SSAlogoemail
SW Cole Geotech report of 04.18.01