parcelsfolder.portlandmaine.gov - /Files/038/038 B001/Building Permits/2016-02766 Building Alterations - Commercial/1. Original Plans/


[To Parent Directory]

A01.1 Life Safety Plans
A02.1 Abbreviations & Symbols
A05.1 Floor 7 Demo Plan
A05.2 Floor 8 Demo Plan
A05.3 Floor 9 Demo Plan
A05.4 Floor 10 Demo Plan
A07-4 Floor 10 Demo RCP
A07.1 Floor 7 Demo RCP
A07.2 Floor 8 Demo RCP
A07.3 Floor 9 Demo RCP
A10.1 Floor 7 Plan
A10.1A Floor 7 Dimension Plan
A10.2 Floor 8 Plan
A10.2A Floor 8 Dimension Plan
A10.3 Floor 9 Plan
A10.3A Floor 9 Dimension Plan
A10.4 Floor 10 Plan
A10.4A Floor 10 Dimension Plan
A11.1 Enlarged Floor Plans and Elevations
A11.2 Enlarged Floor Plans and Elevations
A11.3 Enlarged Floor Plans and Elevations
A11.4 Enlarged Floor Plans and Elevations
A25.1 Sections & Details
A40.1 Construction Systems
A55.1 Window Types & Details
A60.1 Door and Frames Types & Details
A60.2 Floors 7 & 8 Door Schedules
A60.3 Floors 9 & 10 Door Schedules
A70.1 Floor 7 Reflected Ceiling Plan
A70.2 Floor 8 Reflected Ceiling Plan
A70.3 Floor 9 Reflected Ceiling Plan
A70.4 Floor 10 Reflected Ceiling Plan
A71.1 Ceiling Details
A72.1 Floor 7 Finish Plan
A72.2 Floor 8 Finish Plan
A72.3 Floor 9 Finish Plan
A72.4 Floor 10 Finish Plan
A80.1 Standard Details
A81.1 Interior Elevations
A81.2 Interior Elevations
A83.1 Millwork Details
A83.2 Millwork Details
A83.3 Millwork Details
Cover Page
E-00.1 Electrical Legends Abbreviations and General Notes
E-60.1 Electrical Schedules
EL-10.1 Floor 7 Lighting Plan
EL-10.2 Floor 8 Lighting Plan
EL-10.3 Floor 9 Lighting Plan
EL-10.4 Floor 10 Lighting Plan
EL-50.1 Lighting Control Details
EP-10.1 Floor 7 Power and Systems Plan
EP-10.2 Floor 8 Power and Systems Plan
EP-10.3 Floor 9 Power and Systems Plan
EP-10.4 Floor 10 Power and Systems Plan
FA-10.1 Floor 7 Fire Alarm Plan
FA-10.2 Floor 8 Fire Alarm Plan
FL-10.3 Floor 9 fire Alarm Plan
FL-10.4 Floor 10 Fire Alarm Plan
M05.1 Floor 7 Existing Conditions Removal Plan HVAC
M05.2 Floor 8 Existing Conditions Removal Plan HVAC
M05.3 Floor 9 Existing Conditions Removal Plan HVAC
M05.4 Floor 10 Existing Conditions Removal Plan HVAC
M10.1 Floor 7 HVAC Plan
M10.2 Floor & HVAC Plan
M10.3 Floor 9 HVAC Plan
M10.4 Floor 10 HVAC Plan
M50.0 Mechanical & Plumbing Details
M60.0 Mechanical & Plumbing Schedules
P00.0 Plumbing and HVAC Notes, Legends and Abbreviations
P05.1 Floors 7 & 8 Existing Conditons Removal Plan Plumbing
P05.2 Floors 9 & 10 Existing Conditons Removal Plan Plumbing
P10.1 Floor 7 Part Plans - Plumbing
P10.2 Floor 8 Part Plans - Plumbing
P10.3 Floor 9 Part Plans - Plumbing
P10.4 Floor 10 Part Plans - Plumbing
S08.1 General Notes and Load Criteria
S10.1 Partial Plan and Details
S11.1 Partial Plan and Details
SKC-001 Floor 7 Door Schedule
SKC-002 Light Cove Detail & Wood Ceiling
SKC-003 Revised Built-In Bench Detail
SKC-004 Location of Smoke Screen Access Panels @ Floors 8-10 Elevator Lobbies
SKC-005 Floor 10 - ADA Toilet 1091