parcelsfolder.portlandmaine.gov - /Files/025/025 B003/Planning/PEZ.2014-203.Level III Site Plan Over 300,000 sq ft/4. Revised Plans/


[To Parent Directory]

2-20-15
3-16-15
3062B 2014.11.14 Knowland (prelim SP application)
A101 Ground and Entry Plan - midtownTwo
A101 Ground and Roof Plan - midtownFour
A101 Ground and Roof Plan - midtownOne
A101 Ground Plan - midtownThree
A102 Typical and Roof Plan - midtownTwo
A103 Roof Plan - midtownThree
A201 Elevations - midtownFour
A201 Elevations - midtownOne
A201 Elevations - midtownThree
A201 Elevations - midtownTwo
A202 Elevations - midtownThree
A800 Signage Elevations
C-1.0 Cover Sheet
C-1.1 General Notes and Legend
C-1.2 Draft Amended Subdivision-Recording Plat
C-1.2A 2006 Existing Conditions Survey Prepared by SGC (Reference Only)
C-1.3 ALTA-ACSM Land Title Survey (by City Of Portland)
C-1.4 2012 Boundary and Topographic Survey (by Owen Haskell)
C-1.5 Residential Subdivision of Lot 7
C-1.8 Existing Conditions and Removals Plan
C-10.0 Somerset Street Cross Sections
C-10.1 Somerset Street Cross Sections
C-14.0 Predevelopment Watershed Map
C-14.1 Postdevelopment Watershed Map
C-2.0A Overall Site Plan with Dimensions
C-2.0B Accessible Route Plan
C-2.1 Site Layout Plan - midtownOne and midtownTwo
C-2.2 Site Layout Plan - midtownThree
C-2.3 Site Layout Plan - midtownFour
C-2.4 midtownOne and midtownTwo Building Envelope and Open Space Computations
C-2.5 midtownThree Building Envelope and Open Space Computations
C-2.6 midtownFour Building Envelope and Open Space Computations
C-3.0 Grading and Drainage Plan - midtownOne and MidtownTwo
C-3.1 Grading Plan - midtownThree
C-3.10 Proposed Stormdrain Schedules for StormTreat Units
C-3.11 Proposed Stormdrain Schedules for Tree Box Filter Systems Sheet 1 of 3
C-3.12 Proposed Stormdrain Schedules for Tree Box Filter Systems Sheet 2 of 3
C-3.13 Proposed Stormdrain Schedules for Tree Box Filter Systems Sheet 3 of 3
C-3.14 midtownOne and midtownTwo Courtyard Cross Sections
C-3.15 Courtyard and Mews Spot Grades and Water Quality System
C-3.2 Grading Plan - midtownFour
C-3.3 Proposed Spot Grades for East Side of Somerset
C-3.4 Proposed Spot Grades for West Side of Somerset
C-3.5 Proposed Spot Grades for Chestnut Street North
C-3.6 Proposed Spot Grades for Chestnut Street South
C-3.7 Proposed Spot Grades for Pearl Street Extension
C-3.8 Proposed Spot Grades for Elm Street
C-3.9 Data Summary Sheet (Somerset & Chestnut)
C-4.0 Overall Utility Plan
C-4.1 Utility Plan - midtownOne and midtownTwo
C-4.2 Utility Plan - midtownThree
C-4.3 Utility Plan - midtownFour
C-4.4A Electrical Distribution Plan Prepared by FST
C-4.4B Electrical Distribution Plan Prepared by CMP
C-6.0 Erosion Control Plan
C-6.1 Erosion and Sediment Control Details
C-6.2 Erosion and Sediment Control Details
C-7.0 Street and Driveway Cross Sections
C-7.0A Miscellaneous Sections and Details
C-7.1 Transportation Systems and Street Design
C-7.10 Treebox Filter with Underground Storage Details
C-7.11 Boxless Tree Filter for System A
C-7.12 Bayside Trail Retaining Wall Details and Abutter Options
C-7.13 Retaining Wall Details
C-7.2 Transportation Systems and Street Design
C-7.3 San Sewer and Storm Drain Details
C-7.4 San Sewer and Storm Drain Details
C-7.5 Water Details
C-7.6 Water Details
C-7.7 Stormwater Details Stormtreat Systems
C-7.8 Treebox Filter with underground Storage Details
C-7.9 Stormtreat and Brentwood Underground Storage Details
C-8.0 Somerset Street Profile
C-8.0A Somerset Street Profile Facing Noyes Building
C-8.1 Elm Street, Chestnut Street and Pearl Street Extension Profiles
C-8.2 Bayside Trail Profile
Exh. 1 Level III Final Site Plan & Subdiv. Application
Exh. 10 Transportation Demand Management
Exh. 11 AutoTURN Templates
Exh. 12 Transit Stop for Metro
Exh. 13 Stormwater Management Report and O&M Manual
Exh. 14 - Erosion & Sediment Control Plan
Exh. 15 Geotechnical Report
Exh. 16 Environmental & Historical Considerations
Exh. 17 Compliance with Zoning & B-7 Requirements
Exh. 18 Proposed Easements, Covenants,
Exh. 19 Review of Section 14-526 Design Standards
Exh. 2 Project Description
Exh. 20 Compliance with Comprehensive Plan
Exh. 21 Areas to be Disturbed by Construction
Exh. 22 Sample of Exterior Materials
Exh. 23 Written Waivers
Exh. 24 Leed Information
Exh. 3 Title, Right or Interest
Exh. 4 Technical & Financial Capacity
Exh. 5 Utilities Narrative
Exh. 6 Fire Dept. Review & Life Safety Plan
Exh. 7 State & Federal Permit Requirements
Exh. 8 Construction Management Plan
Exh. 9 Traffic Report
L1 Landscape and Lighting Plan
L2 Landscape and Lighting Plan
L2.0 Landscape Details
L2.1 Landscape Details
L2.2 Lighting Details
L3 Landscape and Lighting Plan
midtown Project Final Level III Site Plan & Subdivision Application
Site Plans Revised 01.21.15 Bubbled Revisions
Submission 1-22-15