parcelsfolder.portlandmaine.gov - /Files/201/201 A005/Planning/PEZ.2014-199.Plan Amendment - Board Level III/1. Original Plans/


[To Parent Directory]

C 2.5 ALTA ACSM LAND TITTLE SURVEY
C 2.6 ALTA ACSM LAND TITTLE SURVEY
C 2.7 ALTA ACSM LAND TITTLE SURVEY
C 2.8 ALTA ACSM LAND TITTLE SURVEY
C-1.0 Cover Sheet
C-1.1 General Notes and Legend
C-10.0 Sanitary Sewer Profiles
C-2.0 Subdivision Plan
C-2.0A Easements and Encumbrances
C-2.1 Subdivision Plan Sectional 1
C-2.10 Phase 1 Environmental Remediation Demolition and Removals Plan - East
C-2.11 Phase 1 Environmental Remediation Demolition and Removals Plan - West
C-2.2 Subdivision Plan Sectional 2
C-2.3 Subdivision Plan Sectional 3
C-2.4 Subdivision Plan Sectional 4
C-2.9 Overall Existing Conditions Plan
C-3.0 Overall Site Plan
C-3.1 Site Plan - East
C-3.2 Site Plan - West
C-4.0 Overall Grading and Drainage Plan
C-4.1 Overall Stormwater Management Plan
C-5.0 Overall Erosion and Sedimentation Control Plan
C-6.0 Overall Utility Plan
C-6.1 Utility Plan - East
C-6.2 Utility Plan - West
C-7.0 Pavement Sections and Sidewalk Details
C-7.1 Curbing and Sidewalk Details
C-7.2 Parking and Traffic Control Details
C-7.3 Stormwater Details
C-7.4 Stormwater and Sanitary Sewer Details
C-7.5 Erosion and Sediment Control Details
C-7.6 Erosion and Sediment Control Details
C-7.7 Water and Gas Service Details
C-7.8 Typical Roadway Cross Sections
C-7.9 Typical Roadway Cross Sections
C-8.0 Access Drive Profile
E 1.1 Photometrics Plan
E.100 Electrical Master Plan 1
E.101 Electrical Master Plan 2
E.102 Electrical Master Plan 3
E.300 Electrical Master Plan Details
L1 .0-LANDSCAPE - EAST
L1.1-LANDSCAPE - WEST