parcelsfolder.portlandmaine.gov - /Files/201/201 A005/Planning/PEZ.2014-120.Plan Amendment - Board Level III/5. Final Approved Plans and Documents/


[To Parent Directory]

C-1.0 Cover Sheet
C-1.1 City of Portland Planning Board Subdivision Approval for S
C-1.2 General Notes and Legend
C-10.0 Sanitary Sewer Profiles
C-11.0 Water Profiles
C-12.0 Storm Drain Profiles Zone D
C-12.1 Storm Drain Profiles Zone D and F
C-14.0 Access Drive Profiles
C-15.0 Retaining Wall Profile
C-2.0 Stand Alone Brick North Existing Conditions Plan
C-2.1 Stand Alone Brick North Demolition and Removals Plan
C-3.0 Stand Alone Brick North Site Layout Plan
C-4.0 Stand Alone Brick North Utility Plan
C-5.0 Stand Alone Brick North Grading Plan
C-5.1 Stand Alone Brick North Stormwater Management Plan
C-6.0 Stand Alone Brick North Erosion Control Plan
C-7.0 Stormwater Details Stormtreat Systems and Drip Edge Treatm
C-7.1 Stormwater Details Stormtreat Water Quality Volume Storage
C-7.2 Stormwater Details Filterra Units
C-8.0 Pavement Sections and Sidewalk Details
C-8.1 Curbing and Sidewalk Details
C-8.2 Parking and Traffic Control Details
C-8.3 Stormwater Details
C-8.4 Stormwater and Sanitary Sewer Details
C-8.5 Erosion and Sediment Control Details
C-8.6 Erosion and Sediment Control Details
C-8.7 Water and Gas Servicel Details
C-8.8 Typical Roadway Cross Sections
C-9.0 Stand Alone Brick North Fire Safety Compliance Plan
E1.1 07-24-14
E1.2 08-06-14
E2.1 Site Lighting Plan
L-1.0 Stand Alone Brick North Landscape
Thompsons Point 2014_120_StampedAll