00 01 01 Cover
00 01 10 TOC
00 31 32 Geotech Report
00 31 32.13 Supplement
00 31 32.16 Suppl Micropile Info
00 72 13 A201 1997
00 73 13 SupGenCond DC 2007
01 10 00 Summary
01 22 00 Unit Prices
01 25 00 Substitution Procedures
01 26 00 Contract Modification Procedures
01 29 00 Payment Procedures
01 31 00 Project Management & Coordination
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 42 00 References
01 44 00 Indoor Air Quality
01 50 00 Temporary Facilities & Controls
01 60 00 Product Requirements
01 73 00 Execution
01 74 19 Waste Management
01 77 00 Closeout Procedures
01 78 23 O & M Data
01 78 39 Project Record Documents
02 41 19 Selected Structure Demolition
03 30 00_CIP Concrete
03 37 13_Shotcrete
04 01 20_Clay Masonry Restoration and Cleaning
04 20 00 Unit Masonry
04 23 00_Reinf CMU
05 12 00_Str Steel
05 30 00_Mtl Deck
05 50 00 Metal Fabrications
05 51 00 Metal Stairs
05 52 13 Pipe and Tube Railings
06 10 00_Rgh Carp
06 20 23 Interior Finish Carpentry
06 40 23 Millwork
07 21 00 Thermal Insulation
07 26 16 Below Grade VB
07 31 13 Asphalt Shingles
07 42 13 Metal Wall Panels
07 53 23 EPDM Roofing
07 62 00 Sheetmetal flashing trim
07 72 00 Roof Accessories
07 84 13 Penetration Firestopping
07 92 00 Joint Sealants
08 11 13 Hollow Metal Doors & Frames
08 14 16 Flush Wood Doors
08 14 33 Stile and Rail Wood Doors
08 31 13 Access Doors & Frames
08 41 13 Alum-Framed Entrances & Storefronts
08 51 13 Alum Windows
08 71 00 Door Hardware
08 80 00 Glazing
09 21 19 Shaft Wall Assemblies
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 30 00 Ceramic Tile
09 51 13 Acoustical Panel Ceilings
09 65 00 Resilient Flooring
09 68 16 Sheet Carpeting
09 91 13 Exterior Painting
09 91 23 Interior Painting
10 14 00 Signs
10 55 00 Postal Specialties
10 95 00 Building Specialties
12 48 13 Entrance Floor Mats & Frames
14 24 00 Hydraulic Elevators
21 00 00 Fire Sprinklers & Standpipes
22 00 00 Plumbing
23 00 00 Mechanical
23 09 00 ATC
26 00 00 General Elec 9-23-2010
26 05 19 Low Volt Elec Pwr Cond 9-23-2010
26 05 26 Grounding 9-23-2010
26 05 29 Support 9-23-2010
26 05 33 raceways&boxes 9-23-2010
26 05 53 Identification 9-23-2010
26 06 50.16 Ltg Fixture Sched
26 09 43 Lighting Controls
26 22 13 distr transf 9-23-2010
26 24 16 Panelboards 9-23-2010
26 27 13 SUB-METERING 9-23-10
26 27 26 Wiring Devices 9-23-2010
26 28 16 enc sw 9-23-2010
26 29 13 enc mtr cntrlrs
26 43 13 TVSS 9-23-10
26 51 00 Interior Lighting 9-23-2010
26 52 00 emrg lighting 9-23-10
26 56 00 Exterior Lighting
27 00 00 General Communications
27 10 00 structured cabling
28 00 00 General Requirements for Elec Saf and Sec
28 13 00 Door Access Control 9-23-2010
28 31 13 Fire Alarm PowerPay
31 02 00 DEVELOPMENT PERMITS-CCSB
31 02 10 Subsurface Investigations-CCSB
31 10 00 Site Preparation-CCSB
31 14 00 UNIT PAVERS CCSB
31 20 00 Earthwork
31 25 13 Erosion Control
31 63 33 Drilled-in Mini-piles
32 11 23 Aggregate Base Courses
32 12 16 Pavement, Walks & Curbs
32 28 32 SEGMENTED BLOCK RETAINING WALLS CCSB
32 28 50 SITE IMPROVEMENTS-CCSB
32 31 13 Chain Link Fences and Gates-CCSB
32 90 00 Planting-CCSB
32 90 10 SEEDING-CCSB
33 31 00 Sanitary Sewer System
33 41 00 Storm Drainage