parcelsfolder.portlandmaine.gov - /Files/059/059 A003/2014-01694 Building-New Commercial Structure/4. Revised Plans/
[To Parent Directory]
100 West Commercial - Architects Certifications
1349a E1.0 09-11-14
1349a E2.0 09-11-14
A0.00 - COVER SHEET
A1.01 - FIRST FLOOR PLAN
A1.02 - SECOND FLOOR-MEZZ. PLAN
A2.01 - BUILDING ELEVATIONS
A2.02 - BUILDING ELEVATIONS
A3.12 - STAIR SECTIONS AND DETAILS
A4.00 - WALL TYPES
A4.01 - INTERIOR ELEVATIONS
A4.02 - INTERIOR ELEVATIONS
AS1.1 - ACCESSIBILITY STANDARDS
COMCheck - 100 Commercial Street
Email confirm no SFM permit
Email response from Archetype
new yard IBC special inspections 091014
NEW YARD PHASE 2 WET CALC.WXF
Plan review email response
Portland Yacht Phase 2
PORTLAND YATCH BLDG PH2 FP-01
S 1 Anchor Bolt Layout
S 2 Reaction 160x50
S 2 Reactions 30x144
S 3 Frame Cross Section
S 3A Frame Cross Section
S 3B Frame Cross Section
S 3C Frame Cross Section
S 3D Frame Cross Section
S 3E Frame Cross Section
S 3F Frame Cross Section
S 3G Frame Parts
S 4 Roof Framing Plan
S 4A Roof Framing Details
S 5 Sidewall Framing Plan
S 5A Sidewall Framing Plan
S 5B Line C Framing Plan
S 6 Endwall Framing Plan
S 6A Endwall Framing Plan
S 7 Wall Panel & Insulation Plan
S 7A Liner Panel
S 8 Roof Panel and Insulation Plan
S 8A Roof Panel & Insulation Plan
S A Notes
S Cover Sheet