From: "Hines, Breton" To: "crm@portlandmaine.gov" , "petruccellid@portlandmaine.gov" Date: 1/30/2015 2:32 PM Subject: Action plan for fire code compliance - 43 Bolton St. Hello Gentlemen, I am emailing to inform your department of my plan to bring my 3 unit building to compliance within one calendar year. Steps already taken: 1. Replaced existing smoke detectors in 2nd and 3rd floor units with combination photo-electric smoke detectors. 2. Installed photo-electric smoke detector in basement. 3. Installed smoke detector system during re-model of 1st floor unit (smoke detector system is up to current code). 4. Installed sprinkler system over gas boiler, and gas water heaters. Steps I will take: 1. Replace 2nd and 3rd floor entry doors (front and rear) with 60 - 90 minute burn time slabs. 2. Install photo-electric smoke detectors in front and rear hallway. Please let me know if you have any other questions or concerns. Thank you, Breton Hines (Owner) 43 Bolton St. Portland, ME 04102 Confidentiality Notice: The information contained in this message (including any attachments) may contain privileged and/or confidential information protected from disclosure by the Family Educational Rights and Privacy Act (FERPA). It is intended solely for the use of the addressee. Any disclosure of the document is strictly prohibited outside the scope of the service for which you are receiving the information. If you have received this communication in error, please notify sender immediately and delete the material from any computer.